Go Back   ChinaRiders Forums > Technical/Performance > Dual Sport/Enduro
Register FAQ Community Calendar Today's Posts Search
 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 07-19-2022, 05:22 PM   #1
zscr   zscr is offline
 
Join Date: Dec 2021
Posts: 7
Front axle torque and assembly sequence

So I was planning on changing my tires and fork oil. However I don’t what’s the sequence to follow with this axle since it has 4 pinch bolts. Also there’s no nut at the left side , the fork leg is threaded at that side so I don’t know what torque should be applied to this? The bolt head is an Allen 10mm. In the rear axle I have used the tt 250 spec(35 ft lbs) without issues. The bike model is ZS250GY-7 but I haven’t found a manual for it.

Photos of the axle:

Name:  AD700749-8F2C-418D-85D8-5B840E1EFE9A.jpeg
Views: 161
Size:  239.3 KB
Name:  40EA922A-8CD4-485B-8617-AE8989467425.jpeg
Views: 171
Size:  261.0 KB
Name:  2042C9EC-89F4-4178-9B71-67282F2CBB0F.jpeg
Views: 170
Size:  247.6 KB


 
Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:37 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.