08-31-2017, 09:33 PM | #11 |
Join Date: Feb 2007
Location: West Virginia
Posts: 1,194
|
Just ordering up the last of my parts this weekend. The steel will be coming as well. I'm excited to make some progress and get the frame finished. It will be done this month. The Hemi engine will be built over the Winter. The Coleman should get me onto my hunting land without a problem.
I'm trying to determine the length to stretch the frame rails. These bikes will comeback toward the rider on steep sections.
__________________
2013 Jeep Wrangler Sahara MOAB 2005 BMW E53 X5 2011 Schutt Industries LTT-HC LQG trailer 2017 Coleman CT200U 1978 Yamaha SR500E 1979 Yamaha XS650 Special II |
|
|
|
|
|