Latest upgrade from Outhouse Engineering and Fabrication, where our slogan is "Measure Once And Hope For The Best".
Total outlay was zero cents. Had the sheet metal. The muffler clamps and LEDs were left over from projects at work and my boss just told me to make them "Go Away".
Found out the that the tub is electrically insulated from the bike. So, 60 minutes to install and wire. 90 minutes to troubleshoot.
Those extra speedholes in the sheetmetal? Yeah, see the slogan for OE&F.