Quote:
Originally Posted by McQueen216
- Hell yeah.
- How long did this rebuild take you. It's impressive as hell, considering it included a new shed and a boss that has that kind of a leadership approach.
- Not gonna like, it's Frankenstein as hell - and works.
- I really think a Scrambler-style exhaust on this would be da bomb.
|
1. Hell yeah!
2. It took me a long time because there was much to be done to finalize the shed interior to receive the engine. I store the bike in there and do minor service in there but the storage was all wrong and unorganized. Once the bench was clear I had the engine on it pretty quick. I think the rebuild itself took shy of a month due to having to acquire tools, and having to buy a new yx140 head, that set me back some. I took the engine and the head apart. Lots going on in there. Good bosses are rare these days amen
3 every frankenshed needs a frankenbike. Lol once the fairings are back on it'll look less gnarly
4. Got a picture? I got this muffler for free