View Single Post
Old 02-02-2020, 05:44 PM   #30
Oddball Matt   Oddball Matt is offline
 
Join Date: Jan 2020
Location: Vääksy, Finland
Posts: 401


New bearings and seal pressed into the rear carrier, got an email last Friday that my brake parts have left the Netherlands only after waiting three short weeks from ordering so postponed the axel assembly so I don`t have to do it many times.



While waiting I`ve tried to tie up the loose ends, finished the exhaust reroute (well, still have to remove the front part, adjust the angle of the joint and weld all tacked pieces properly together.) The welds look horrible for three distinct reasons: I had to use parts of the original exhaust to size up at the connector, the original exhaust is a bitch to weld onto being thin walled and inferior quality metal, and most of all I`m not that good at welding.

Also did some electric work extending the wires of both rear turning indicators and welded a bracket for the starter relay onto the battery box but didn`t see necessary to take pics of those.
__________________
2004 Longjia Grido 50 scooter
1999 Cagiva Mito 125 Evo, Yamaha XV125 engine, Ducati SS fairings, getting turboed
1993 Yamaha GTS 1000
Ex:Bashan BS200-S7 `07 Streetfighter-quad


 
Reply With Quote