View Single Post
Old 05-03-2017, 09:22 AM   #1
XDoubleXA   XDoubleXA is offline
 
XDoubleXA's Avatar
 
Join Date: Apr 2017
Location: Ohio
Posts: 89
Well, the Shark has made its arrival.

Besides various stripped out bolts, stripped out frame holes,throttle grip wont get tighten enough to not move with those crappy phillips screws, and my plastics having scrape marks, everything went together pretty decent. Bike looks good, going to fire it up sometime this week after i get the brakes adjusted, and some holes in the frame retapped. I seriously need to to replace those junk phillps screws that hold the throttle grip and the electric start assembly on.
Attached Images
   



Last edited by XDoubleXA; 05-03-2017 at 11:52 AM.
 
Reply With Quote