View Single Post
Old 05-10-2016, 08:25 AM   #9
cheesy   cheesy is online now
Moderator
 
cheesy's Avatar
 
Join Date: Jul 2010
Location: Elburn, IL
Posts: 5,822
Prepping the site for the new shed. The install got moved back a week, so I have a bit more time to get things ready.


Spec for the new shed calls for the site to be within 6" of level. The 14' x 14' pad for the shed was 13" out, hence the short wall. All that is left to do, if it ever stops raining, is to fill with gravel and compact.

More tools of the trade. A small, easy to handle 20v Dewalt 1/2" drill and the 'Beast', a 36v Bosch 1/2" wrist snapper.
__________________
Cheesy
______________________________________
07 Hi Bird Enduro-Flown the Coop

07 Ural Gear Up
79 Honda CX500
77 VeloSolex 4600 V3
73 VeloSolex 3800

I'm making this up as I go.-Indiana Jones

Telling me something 'is for my own good', is a fast way to a fat lip.-Me

I don't even care about my own problems, why should I care about yours?-Quote on one of my favorite t-shirts


 
Reply With Quote