Prepping the site for the new shed. The install got moved back a week, so I have a bit more time to get things ready.
Spec for the new shed calls for the site to be within 6" of level. The 14' x 14' pad for the shed was 13" out, hence the short wall. All that is left to do, if it ever stops raining, is to fill with gravel and compact.
More tools of the trade. A small, easy to handle 20v Dewalt 1/2" drill and the 'Beast', a 36v Bosch 1/2" wrist snapper.