View Single Post
Old 04-03-2015, 04:21 PM   #2658
CSCDude   CSCDude is offline
 
CSCDude's Avatar
 
Join Date: Sep 2014
Posts: 247
Quote:
Originally Posted by oldqwerty View Post
I'd be surprised if there WAS a problem. Several EFI models from various manufacturers run perfect out of the crate, obviously getting it right can be done, and it is also obvious that the folks at CSC love a challenge and are never satisfied. That's why I ordered one--close to perfect for my needs right out of the crate. Obviously whomever speced the Cyclone has been paying attention to the threads on various sites about the perfect small displacement adventure bike.

If I decide to upgrade to the better luggage and/or 19-inch front wheel can I deal with that when the shipping notice is sent or should I go ahead and call it in?
I would call it in. The 19-inch wheels are a good 50 days out, but the Tourfella bags are in and they are going fast.

Regarding the earlier question about what's left in what colors, it would be best to call and ask for Ryan at 909 445 0900.
__________________
Joe
www.ExhaustNotes.us


 
Reply With Quote