ChinaRiders Forums

ChinaRiders Forums (http://www.chinariders.net/index.php)
-   Ride Suggestions (http://www.chinariders.net/forumdisplay.php?f=117)
-   -   CSC planned PCH group ride, 2017 (http://www.chinariders.net/showthread.php?t=18330)

1cylinderwonder 02-25-2017 03:16 PM

CSC planned PCH group ride, 2017
 
It looks as though CSCDude will have to reschedule the PCH (Pacific Coast Highway, HWY 1) from Cambria to Carmel, ride this spring or summer.
According to CalTrans Hwy 1 is closed from Ragged Point, North due to a rock/mud slide, and at Pfeiffer Canyon Bridge due to cracked and misaligned bridge pillars and a sagging and cracked road surface.
CalTrans estimates a 9 to 10 month closing to demolish and replace the damaged bridge. :hmm:
So maybe another destination can be found.
1CW :hi:

culcune 02-25-2017 04:22 PM

I wonder if Jerry Brown's multi-BILLION dollar rocket train debacle could fill in as a substitute :lmao:


All times are GMT -4. The time now is 09:11 PM.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.